Quote:
Originally Posted by
marneypoo 
Do you have an air vent to open or a air plug of some sort to remove?
Good point .But its only got 2 small holes on dome lid where it meets the base maybe 1/16 in .One on Dome where it meets Black control top maybe 3/16 in hole.Have been toying with maybe drilling another on other side of Dome.BUT?????...cva34
Been playing with it in spare time.Factory water set up is a 2 in D plastic cup in center.Its divided vertically ,so it has 2 chambers.Factory says Fill one side for Inc./ both sides for Lockdown.
Right now running W/O water and a calibrated HYD in it RH is 32%
Running with 1 side of chamber filled with H2O RH is 62%
Running it with both chambers filled with H2O RH is 80 %+
Looks like I got problem found .Just got to figure out how to reduce chamber size.Without permanently modifying it..Need to find something to fit in one chamber that reduces its surface area by maybe 1/2 or so for Inc.. then during LD run with only one side filled and the reduced size one MT (empty)....cva34