Chainsaw Coop 1

By tackyrama, Jan 11, 2012 | |
  1. tackyrama
    Four long years ago I cleared the brush, dug some stumps and began laying out footings for a floating slab.


    To cut down on materials I Utilized some very old cement blocks that were laying around in my woods for part of the footings. The slab and footings are laid on top of 6 inches of class 5 gravel from the old railway bed that is on one side of my property.

    After this work came to a halt for a year. Work begins in earnest the year after on the next page.

    Share This Article


To make a comment simply sign up and become a member!

BackYard Chickens is proudly sponsored by