PAGE 3
On to the roof!
9745_picture_013.jpg

My floor is not PT so it was stressful to see rain in the forecast. The roof was two sheets of plywood, one sheet on each side. I definitely needed help getting that on. Standard asphalt roof went on soon after.




9745_roof_001.jpg

9745_picture_002.jpg











Asphalt worked out to be the cheapest option and I tried to find a light color to keep it cooler.
My peeps are here! Now I am under the gun to finish by the time they are 5 weeks old! I have 5 golden lace Wyandottes and 5 silver lace Wyandottes.
Run and floor on page 1
Plans on page 2
Framing and Siding on page 4
Finishing up on page 5
  • Like
Reactions: getaclue