the siding and the flooring/roof wont be done for at least another 2 wks..but its a start right??
Dh is working his grueling 77 hrs this wk..and he'll be able to work on it next wk..but hey; some friends came
over today and framed it all out!!!
10x10 all framed woohoooo!
Now this will be the run from the coop back to the field..about 250-300 sq ft..
ETA:
finally; siding up on two sides almost and 1/2 a roof lol...he is putting windows in as well..not sure
how..but he said he is...
ETA 3/12
all siding on -- one small vent up - more pics later..hoping to get the door on ..wind is 22MPH today..
Dh is working his grueling 77 hrs this wk..and he'll be able to work on it next wk..but hey; some friends came
over today and framed it all out!!!
10x10 all framed woohoooo!
Now this will be the run from the coop back to the field..about 250-300 sq ft..
ETA:
finally; siding up on two sides almost and 1/2 a roof lol...he is putting windows in as well..not sure
how..but he said he is...
ETA 3/12
all siding on -- one small vent up - more pics later..hoping to get the door on ..wind is 22MPH today..
Last edited: