6" steel channel used as floor joist and runners underneath, not sure of spacing.total base frame welded. 3/4" plywood floor, then first layer long sides with 3" log end over hang. used landscape timbers as logs.short ends squared up, mark where short log meet s at corner, trace around on long side, then routered out notch.alternate notch placement each layer from long sides to short. we made jig from sawhorse n groved 2x4.
 
400
we had to measure each log to keep our 12'x8' frame, logs not uniform or straight. most spikes were 6" long and we used longer spikes on warped logs to help bring them square.
 
400
we averaged 4 to 5 layers a night with mostly 4 ppl working.two to cut n router,one measure, mark and place log. last to finish nailing in place.
 
400
roof going on. we had shingles left from reroofing our cabin. plywood was given by friend.
 
400
3" gap running length of roof peak covered with cobra coil, soffet placed at both ends at peak with a cut out piece of plywood to cover in winter
 