- May 30, 2009
- 76
- 3
- 41
So first off started by building floor and roof segments
Then the framework was assembled and hardware cloth (1/2in) was run
Next a roof was added and a back
The doors were cut and hinges were added and so were latches as so
And last it was given some legs to get it up off the ground and ready for the birds
Bird pics to come