Retaining walls are in, pen is level with dirt. Hardware cloth needs to be installed on outside perimeter and back filled at a later date.
Rickjenkins47

Retaining walls are in, pen is level with dirt. Hardware cloth needs to be installed on outside perimeter and back filled at a later date.

There are no comments to display.

Media information

Album
Rick's Chick Condo
Added by
Rickjenkins47
Date added
View count
220
Comment count
0
Rating
0.00 star(s) 0 ratings

Share this media

Back
Top Bottom