I used this brush to do the walls and floor. I was gonna use a roller for the floor but it was going on so easy, on the walls, that I just kept going and did the 8 x 12 floor also. https://www.lowes.com/pd/Project-So...nt-Brushes-Common-3-in-Actual-3-01-in/3775191
I did 2 coats. The first one was lighter and was dry enough to do the second coat after 24 hrs. The second coat was a little heavier and took a little longer to dry, maybe a day and a half. It will vary depending on the humidity and temps. My temps were about 70 during the day and low 60's at...
Here's the floor after the second coat, it came out great. The pail with my mixing stick and finally the coop in progress. The flip outs will be windows, there is one on each side also. The door will have a window as well. I'll post my coop build in a different thread.
OK, I just did my coop today. I turned the container upside down for about 30 hrs, before using it. I opened it up and there was rubber top to bottom, with the liquid. I used a 2 x 3 x 4 to stir it up, one hand low near the bucket and one hand near the top of the board. Using that method made it...