Search results for query: *

  1. B

    Building on a slope

    Quote: Will mean it is 2ft higher at that end and will need to figure out how to seal the gap along the ground. Instead of building "panels" and setting them on piers, just use posts of different lengths Run your wire level at the top, then cut angled strips as needed to fill in the bottom...
Back
Top Bottom