Search results for query: *

  1. DobieLover

    How long should my screws be?

    Proper construction would never see this. The 2x6 floor joists (covered with subfloor) will always be perpendicular to the 2x4 baseplate of the wall. Therefore, to secure the wall to the floor, one would need to screw through the 1.5" baseplate, ~0.5" floor then into the 5.5" floor joist. In...
Back
Top Bottom