- Thread starter
- #91
In my hoop coop and hoop green house, I used roofing nails placed about every 12" along the bottom framing of the structure. I then used braided nylon twine (like mason's twine) to zig zag from first nail on E, over the top, to first nail on W, back over the top to second nail on E, over top to second nail on W... rinse and repeat all the way to the end. This gave a zig zag that held the tarp or plastic tight to the frame and prevented it from abrading against the frame when the wind buffeted the structure.