- Mar 23, 2014
- 21
- 6
- 24
My slope was only a 6 in difference, but maybe you could do your in stages. Do each section as a seperate unit with a stair step along the side going up. Make each section so you can easily work in it. We used concrete (cinder) blocks and gravel to get the peremeter as level as possible. The blocks come in several different sizes and that helped getting our 8 x 20 foot peremeter. On top of the blocks, we laid 48 inch wide, 1/4 hardware cloth the length of the run and to make up the missing midle inches, we laid a 24 inch width of it over the middle all the way down the 20 ft. Then we laid 2 inch high block toppers on top to hold in the mesh securely. We laid a bead of contracter adhesive that comes in a tube that you need the gun applicator for. We used 2 tubes of it and laid the 2 x 4 lengths of wood on the adhesive. Hopefully nothing will get through. By making the base with the blocks level, we could do the rest of the framing easily. We made the highest point 7 1/2 ft and the back 6 1/2 ft along the 20 ft length so we have no problem standing in the run.