A flowerbed in front, into which we dump the old/fouled water. It's just been filled, transplanted, bulbed, and seeded here. We'll perfect and enlarge it after all of the construction is complete.
The small, first part of the run is done. It's only 10' x 10' but it's only the beginning. This small part is the only portion that will be roofed, providing a fresh-air place to hang out in the worst of weather. In the belowe pic, you can see the top portion of the buried I-beam (to prevent digging under).
Here, you can see the framework poles that are welded to the buried I-beam as well as the roof for support. On the far corner, the poles are closer together. That is where the next section of run will start, eventually encircling the kitchen garden.
The completed run is covered in sheet metal along the bottom and chicken wire along the top. Eventually, we'll likely splurge for welded wire but, for now, chicken wire was already on hand, no money out of pocket. Dogs are our main daytime threat, with the nastier things not coming around until nighttime when the birds are shut up tight in the coop.
Just after cutting open the big bird door, they began venturing out, loving the new area to explore. (No, the fan is not staying. That was there to blow away the mosquitoes while I sat "supervising" with the baby.)