Another trip to Lowe’s today! Bought hopefully all the rest of the wood needed for the coop and run! Still probably gonna need one more trip for hardware and a couple other things, but I’m almost ready to cut siding and attach!
Lowe’s also had cheap pre-cut metal sheets that are the perfect size for the roof! So I bought some Krylon Fusion black spray paint and roofing screws. It’s hard to fit stuff in our vehicles so this was a great solution! I’m really happy how it looks!

Now I just have to figure out a ridge cap. Lowe’s apparently won’t cut metal after all and I don’t need a 10 ft long ridge cap—nor wud it fit in our SUV! I might as I buy it and sit cutting it down in the parking lot…haha. So gonna work on that.
Got a bunch of hardware too—some from the decking area and some from the gate hardware section. I also found nice 2x2x3 ft redwood decking balusters to use to connect the feet on the coop so I can attach hardware cloth. I plan to paint them black, but since they will be making ground contact, redwood was the best option! They don’t readily stock the severe weather wood as 2x2s and I needed to cut some cost where I could so we shall see how things go! They were $3/each and the severe weather ones were $6/each so it works!
My hardware cloth arrives tomorrow, so that’s probably my next big chore! And the husband will be cutting wood! I wanted the black cloth instead of regular and Lowe’s had the best price but I had to ship it!