Ok..... After 2 weeks of TERRIBLE weather and being unable to work on my new coop, I FINALLY had 39 degrees outside today and our first day without rain! It was still too muddy for me to drag out the power tools, so I dug a trench. a long trench. About 15 inches deep, by 150 feet long. Buried my water and electric lines to the coop. Haven't made the connections yet, but the worst part is done!! YAY! Chicks coming in 3 weeks..... I can't wait!
I Need just a few more productive days to get the coop done...... then I can start on the run.
I LOVE this forum!
Hope you all had a wonderful day!
Jeff
I Need just a few more productive days to get the coop done...... then I can start on the run.
I LOVE this forum!
Hope you all had a wonderful day!
Jeff