Total cost including gas to round up and haul the pallets, and hardware cloth, $22.78. Well not quite that much because I have already built a rabbit hutch and will have enoufh left to build a new A-frame chicken house which will be 10'×8'×8'. Even the nails were salvaged.
Last edited: