New Build - 4/20/20 to present

12/24

putting in floor before putting down linoleum and framing up walls and windows.

floor will have ~8" of deep litter on it.
 

Attachments

  • F1BEB579-AC0B-4ECB-B3F7-50448D500D2E.jpeg
    F1BEB579-AC0B-4ECB-B3F7-50448D500D2E.jpeg
    1 MB · Views: 4
  • AE8C7A24-F087-4AAC-91DD-5816B8A651C9.jpeg
    AE8C7A24-F087-4AAC-91DD-5816B8A651C9.jpeg
    902 KB · Views: 4
  • 6E301D5A-5EDC-4710-92B0-0C420BDA81C9.jpeg
    6E301D5A-5EDC-4710-92B0-0C420BDA81C9.jpeg
    870.6 KB · Views: 6
Wow! Excellent and inspiring.
thank you.

slowly but surely it's coming along. initially started, then changed jobs and got too busy to work on it.

summertime there were opportunities, but with hundred degree weather i could only spend about an hour in all the welding garb before overheating.

working on getting walls up today, will try to get more pics of progress posted up here.
 

New posts New threads Active threads

Back
Top Bottom