Well, I got at it around eight and stopped at noon (gotta watch LSU). So, since yesterday this is what I did so far this morning. finished framing other wall. Framed openings on either side of front door for two long, narrow windows. Put in joists and framed roof and braced. Will start on osb after the game.
Here is where I stopped yesterday.
This is what I did so far this morning.
Yhid view is from the back. Shows the location of coop 2 in relation to our big coop and run. All of the area to the right of new coop will be run built just like the other run for the big girls.
More to follow.
Erik
More to follow.
Erik