Today's progress:

2x8s around floor perimeter with 2x4s between 2x8s and outside sheathing - To contain Deep Liter

Sheathing is 1x various widths rough cut Eastern Yellow Pine - Front Windows & Ador1 Door installed.
Hopefully, next weekend we'll get the sheathing finished on all 4 sides. I still have to make frames for the windows and Ador1 door.
More pics to come next week.