New Super Coop!

The coop, other than the interior and front porch, is done. Installed the gable vents and nesting box today. Just need to paint the nesting box and the exterior is done. Next is the interior, run and covered front porch.


20180605_172115_HDR.jpg 20180605_172122_HDR.jpg 20180605_172129.jpg 20180605_172152.jpg 20180605_172203_HDR.jpg 20180605_172211.jpg
 
Took a break from the coop to get the run going. Other than that, everything that is left I can do without help - taking advantage of my better half's days off.. The run frame was built yesterday (2x4's and Kreg HD pocket screws). Today it's cobbled together in the garage getting painted (primer coat done). Then I'll install the hardware cloth, install the panels on the 4x4 foundation and then trim it out. Run is 12' long and 6' wide, shorter then the coop but mimics the same roof line (a little shallower). It will have a metal roof on rafters and purlins.

20180613_104951.jpg
 