- Thread starter
- #11
- Jul 27, 2010
- 64
- 0
- 39
yep as soon as you introduce a control for water that type of project becomes way more expensive but controlling temps and multiply heat sources is not so much an issue. was thinking of something similar to a power strip with 4 or 5 connectors standard US A/C one or two able to be on a 18 day clock through the Chip. If you could do that then it would save alot of worry from a starter.