Quote:
Okay, Here we go:
The pipe used to make the "bottle" is 4" waste amd drain pipe....very light weight. The screw on top is called a clean-out. At the bottom, and adpter to change to DWV (Drain, Waste and Vent) 3", Then add a 3" x 1 1/2" DWV Reducer. Then 1 Schedule 40 1 1/2" to 3/4" bushing
The final piece is just a short piece of 3/4" PVC which you can cut to lenght to adjust the release.
All this is filled with water and dumped into the removable water tube. It starts with a 2" DWV Elbow glued to a 1' length of 2" PVC. This has 3 2" holes drilled in it spaced acording to your wall thickness. This is xlosed with a 2" schedule 40 plug and a 2" union.
The food tube is also 4" Waste and drain pipe with a clean-out at the top.. At the bottom is a 45 degree bend, then more tube and finally another 45 degree bend. This could change for different wall thickness.