Hi everyone. I need to build up the ground in the run of the new duck palace we are building. I'm wanting to basically do the deep litter method in the run but I need to fill it to the bottom board to start out with. . should I just fill it with dirt? Layer rock and then dirt for drainage? Ideas and brainstorming is needed! Thanks in advance
