Hi, Today I got alot acomplished in the rund area. Painted all of the run roof framing, installed the metal roof and built the gate and set up temporary chain link fence panels in the run area. The girls took their first steps outside today. Didn't get any photos of the run as it was getting dark. Here are two pics showing the roof finished and storage cabinet. Their feeder and water fount will be under metal roof to protect it during rainy weather. Will be building a ramp from pop door to ground tomorrow and spreading some more sand in the run among other things. Really starting to shape up. Hopefully have electricity run on Sunday along with finishing touches. Last thing will be finishing shingles on roof now that I can stand on metal roof...makes it alot easier. Thanks for looking.
Erik
Erik