• giveaway ENDS SOON! Cutest Baby Fowl Photo Contest: Win a Brinsea Maxi 24 EX Connect CLICK HERE!

Building New Coop - Ventilation Check

Update: started and got the floor framing and two walls built today. Lots of work getting the base leveled and square. Feeling good though!! 2 sheets of 3/4” Plywood put on top of 2x6 treated joists.
 

Attachments

  • 34C62D8A-22E9-418C-8AF2-71F6C0280A5C.jpeg
    34C62D8A-22E9-418C-8AF2-71F6C0280A5C.jpeg
    922.3 KB · Views: 21
Another good day! Slowly but surely we are getting closer. 3/4” T1-11 on the siding. Need to finish staining them. Roof, 30#felt with ridge vent 90% done today. Worked until dark, will get more photos once done. (Still have to cut out all the windows and doors)
 

Attachments

  • E3E99E65-9C45-417F-80A9-1F70106B89AA.jpeg
    E3E99E65-9C45-417F-80A9-1F70106B89AA.jpeg
    392.5 KB · Views: 15

New posts New threads Active threads

Back
Top Bottom