If all goes well, we'll be moving to 2 acres in December! The house passed the inspection process, just need to get through appraisal and making sure the loan holds up!
It's a cute cape cod, 3 beds, 2 baths, BIG kitchen! Major improvement from where we are, 2 bed, 1 bath on 1/2 acre. The only thing missing is the garage, but plenty of space to put one!
What are we going to do with all that yard space? So excited!
It's going to be a lot of work... needs cleared in a bad way. The back is like field and forest converged on each other, and then honeysuckle showed up and chocked them both. But there is a gentle slope in the middle where we can do tiered gardening, and a flat spot at the back for... goats? Ordinance says I can have 2 goats as long as their house is set back 100 ft.
Some projects inside too, like the hot tub in the master bath is disconnected and old as heck, so it needs ripped out. We were thinking on a smaller tub so that we can put a closet in the remaining space. Doesn't really need a big 4 person tub.
Everything else is minor cosmetics or general updates. The important things have been done. Plumbing, electrical, etc all checked out fine and is new. Could use a furnace and a/c upgrade, but the existing works.
SO excited! Still about 35 days till closing though. Lot's of waiting around.
It's a cute cape cod, 3 beds, 2 baths, BIG kitchen! Major improvement from where we are, 2 bed, 1 bath on 1/2 acre. The only thing missing is the garage, but plenty of space to put one!
What are we going to do with all that yard space? So excited!
It's going to be a lot of work... needs cleared in a bad way. The back is like field and forest converged on each other, and then honeysuckle showed up and chocked them both. But there is a gentle slope in the middle where we can do tiered gardening, and a flat spot at the back for... goats? Ordinance says I can have 2 goats as long as their house is set back 100 ft.
Some projects inside too, like the hot tub in the master bath is disconnected and old as heck, so it needs ripped out. We were thinking on a smaller tub so that we can put a closet in the remaining space. Doesn't really need a big 4 person tub.
Everything else is minor cosmetics or general updates. The important things have been done. Plumbing, electrical, etc all checked out fine and is new. Could use a furnace and a/c upgrade, but the existing works.
SO excited! Still about 35 days till closing though. Lot's of waiting around.