Got a bit more done on the Elevated Dust Bath for the CQ's. Had to give up on using a lock miter router joint the bit is not correct so I switched to a lock miter dado joint done on the table saw.
Fit to the tubby a bit tight still need a bit of sanding.
Prototype for the legs
The first leg still needs sanding and rounding over the edges but I like the proportions.
The door to Coop Uno is acting up so gotta diagnose that tomorrow...
JT
Fit to the tubby a bit tight still need a bit of sanding.

Prototype for the legs

The first leg still needs sanding and rounding over the edges but I like the proportions.

The door to Coop Uno is acting up so gotta diagnose that tomorrow...
JT