Contractors start tomorrow morning!!

E786F9F8-F27C-483B-80A4-6A91C9303684.jpeg
ACF4377B-B6F0-4E4B-88A1-6F9177EB6519.jpeg
The cheap vinyl is down. And up the walls (halfway)! The poop boards will be built tomorrow and covered with more cheap vinyl.
The run is encased in hardware cloth and the door will go on tomorrow.
Hopefully, the flock will go in tomorrow evening!!!!!!
 
If you don’t mind my asking, how much is this costing you? Are you supplying the materials and paying for the labor?
Too much!
But I'm also getting a big shed along with the coop and run!
I've purchased some of the materials (hardware cloth from Amazon, vinyl flooring from HD, old windows at $3 a piece they Facebook) and reused old doors from an abandoned house on my property. The rest my contractor purchased without charging me more.
 
The shed doors aren’t on yet, but the shed-coop door is (I salvaged it from the old house on my property). The hardware cloth is (finally) installed over the windows, the poop boards are covered with a sheet of vinyl, as are the walls, and tomorrow I will be finishing up the roosts just before the flock moves in!!!
 

Attachments

  • FB5BCCF0-9FE1-4BB7-8165-A5B4B9E4A6CE.jpeg
    FB5BCCF0-9FE1-4BB7-8165-A5B4B9E4A6CE.jpeg
    563.9 KB · Views: 12
  • 688F5411-5318-4B91-8C5B-943DBB1E3095.jpeg
    688F5411-5318-4B91-8C5B-943DBB1E3095.jpeg
    531 KB · Views: 12
  • F8B082A9-D801-4890-A550-40B33A509007.jpeg
    F8B082A9-D801-4890-A550-40B33A509007.jpeg
    387.2 KB · Views: 12
  • CC9D7FEE-D5D7-4881-91FD-B4F19FBD3624.jpeg
    CC9D7FEE-D5D7-4881-91FD-B4F19FBD3624.jpeg
    850.3 KB · Views: 11

New posts New threads Active threads

Back
Top Bottom