- Thread starter
- #71
Bottom boards on. Will need to landscape staple the HWC down in places or just load it up with rocks but a lot of the spare rocks got used in the drainage ditch around the shed, so bizarrely I'm a bit short on rocks at the moment.
Will be adding more screws and washers to secure the HWC over time. For now have just done under the highest-traffic door since I slipped in the rain and almost ripped the skirt off there.
This is the current solution for keeping the door shut after I go in. I've used the same thing on my smaller prefab coop and it was sufficient so don't imagine I'll need to change this but it is a bit fiddly.
Will be adding more screws and washers to secure the HWC over time. For now have just done under the highest-traffic door since I slipped in the rain and almost ripped the skirt off there.
This is the current solution for keeping the door shut after I go in. I've used the same thing on my smaller prefab coop and it was sufficient so don't imagine I'll need to change this but it is a bit fiddly.