after a couple attempts at building small coops from salvage lumber we broke down and are building a 12 x 16 raised floor, insulated, electrical service. All from new material...O Myyyy took the day off work yesterday. Set posts, framed up floor, compressor broke (No framing nailer now) set flooring and framed up three walls with a hammer (I hate the hammer, Love the framing nailer) I'm tired and sunburned. It was 75 yesterday (friday) woke up to ran changed to snow. Now at 10 pm we have 3 inches of snow and still falling. We don't even want to discuss the cost