Granny's gone and done it again

Today i got the birds watered, and then went down to the coop and got busy. The divider is done, i cut and painted the wood for the last panel of the 2nd run. Also cut and painted the wood for around the tree. It is going to take a long time to dry in this weather. I think i will measure the space for the second nest box next, and get that built. Also i can cut the hole for the pop door and maybe install a window.
 
Cap, listen to Twist! :D

Using 12" tiles isn't cheating! Though those big suckers are heavy. Good reason to have a board spacer all along the tub deck so they will sit on it while the mastic dries. Pull that after the grout is done and then caulk when the grout dries.


There is a membership fee? Geez, seems they could skip that part given all the premiums people pay. But I guess if it is a co-op sort of thing, they want everyone to have the same "buy in cost". And yeah, they should break that out as a line item.
:bow:bow:D
 
I would definitely double check his bill and make sure he isn't charging you to rip out and re=do /fix his MAJOR fark up
This seems to be his MO. Stuff gets screwed up when the new guys he hires screw up, then he has to fix it. I specifically told hubby i didn't want this guy putting in my tub.
 
Cap, listen to Twist! :D

Using 12" tiles isn't cheating! Though those big suckers are heavy. Good reason to have a board spacer all along the tub deck so they will sit on it while the mastic dries. Pull that after the grout is done and then caulk when the grout dries.


There is a membership fee? Geez, seems they could skip that part given all the premiums people pay. But I guess if it is a co-op sort of thing, they want everyone to have the same "buy in cost". And yeah, they should break that out as a line item.
The thing is, if we use 12" tiles we have to take down all the tiles and buy new ones.
 

New posts New threads Active threads

Back
Top Bottom