GS and Annie helped me stand the wall up.
it went easy.
earlier I did place a couple of the future rafters across the box of the pick up truck.
I got the whole 12 foot long wall all framed up.
I ended up 4 2x4's short. I will pick them up tomorrow. they are the supports for the double 2x6 beam at the lower edge of the rafters.. I just have to cut 4 inches off of each one and screw them to the full stud at each end of the wall.
then I can level the walls and set the beams and ridge beam.
I will try to remember to take some pictures.

I am tired tonight, but it is a good tired from a good day of progress..

..........jiminwisc......
 
GS and Annie helped me stand the wall up.
it went easy.
earlier I did place a couple of the future rafters across the box of the pick up truck.
I got the whole 12 foot long wall all framed up.
I ended up 4 2x4's short. I will pick them up tomorrow. they are the supports for the double 2x6 beam at the lower edge of the rafters.. I just have to cut 4 inches off of each one and screw them to the full stud at each end of the wall.
then I can level the walls and set the beams and ridge beam.
I will try to remember to take some pictures.

I am tired tonight, but it is a good tired from a good day of progress..

..........jiminwisc......
I love progress! Please do remember to share pictures.
 

New posts New threads Active threads

Back
Top Bottom