- Thread starter
- #21
Oh wait!....my brain just started functioning properly and I think I've seen the light!
So this is the better plan:
Get a small nonrefundable deposit and give them a price per pound.
Ask what size turkey they'd like to have, weight wise.
When the turkeys begin exceeding the optimal weights that I need, then I take them to slaughter.
Is this right?

So this is the better plan:
Get a small nonrefundable deposit and give them a price per pound.
Ask what size turkey they'd like to have, weight wise.
When the turkeys begin exceeding the optimal weights that I need, then I take them to slaughter.
Is this right?
Last edited: