Quote:
Absolutely! I am thinking that once the contractor gets back from the islands it will only take a couple weeks or so till it's finished. The first snow won't get here till mid October
We are painting the feeder today, want to seal the wood base against water penetration just in case...
Also we were researching pop doors. One of our issues around here is the mess of excess shavings being kicked out the door becoming wet slippery hazards or worse, frozen into stumbling blocks. My thought is to make a threshold by laying a 2X4 under the bottom of the pop door opening in hopes that small barrier will be enough to block some of the shavings from just tumbling out.
Tom wants to make the "removable doors" inside the interior pens so that they fold flat against the wall, where they can be latched in place until they are needed, rather than removing them and then having to make a place to store them. Sounds good to me.
The designing continues...
We have had basicly NO summer here so I forget that it's not as late in the season as it feels. I NEED SOME SUN!
Okay, I'm better now.
I lived in Fairbanks for 4 years when I was a kid and my dad was stationed at Loring AFB. We sure did love it.
It's great that you have work you can do even with construction paused.