Today's progress...
Partion wire walls partly done...the main part is. I think I'm gonna put a strip of chicken wire up above the 6ft wire to cover the gap between it and the roof. There's a popdoor, so to speak, between each pen section so the sections can be opened up and joined if need be as well.
Also, the building inspector crew did a big walk through today to make sure everything was up to code....