Hi all, Well I got after it this morning when I got off duty and knocked out alot of tiedious work on nest boxes, siding, trim and painting. Had a deadline of 1: 30 'cause we had folks coming over to hangout in the "Man Cave" and watch out Saints beatup on the Bucs. So, working non-stop since about 7:30...this is what I did. Hope ya like. First Picture is how the right side of coop looked when I started this morning.
Ran a few pieces of siding and trimmed out the clean out door, then built the first nest box and installed in the opening I left during framing the coop.
Got the second nest box in place.
roof on neat boxes completed with drip edge and felt.
Paint and trim on nest boxes finished, ready for shingles, then trim out horizontal windows over boxes, glass and soffit. Doors on nest boxes and cleanout will be done when I do the front door. All will be painted green.
Wife wanted a picture of me with what I did today...she still thinks I am crazy.
Hey, as usual any comments or suggestions at this point would be appreciated. Go Saints!
Erik
Hey, as usual any comments or suggestions at this point would be appreciated. Go Saints!
Erik
