Pictures it is. Was pretty sore after an earth moving day, so here are lock parts and yesterday's progress.
Pivot pin.
The pivot screw mechanism requires 3 nylock 1/4"x20 (thread) nuts, three flat washers, and a 3" 1/4"x20 screw. The bottom section of flat bar below the pivot shoul be longer than the top half.
"L" bracket.
Get the lock mechanism swinging as needed and then place the lag bolt where you want it.
Offcenter counterbalance.
I cast my own lead for fishing and shooting, and all of my ingots of lead are 1lb hemishperes from a 2lb lead ball weight. Any 1lb lead weight would work.
Hope that helps.
So I moved in a few yards of crushed black rock yesterday to build a base about 6" deep.
Then I set my posts.
...and finally I dug my trenches to burry the wire fence.
I'll add a few more inches of black rock to bring it to 12" of depth. This material compacts like concrete after a few rains and some compaction.
Adding fence and builing a door today. Well, time to get to work.