Here are pictures of our coop progress. Didn't think we'd get this far today, but it's coming along well. Sheathing will be next along with getting the windows and vents cut and framed in. Thanks for looking.
Floor, it is 4x6 with joists 18" on center
front wall has a 2x3' clean out door, and pop will be on the right.
back wall will have egg door, 12x24 open-able window and vents along the top
getting ready for the sides which will each have a 12x12" open-able window and vents along the top
sides all on
rafters ready to fasten
I'm terribly sunburnt, that's it for today!
Floor, it is 4x6 with joists 18" on center
front wall has a 2x3' clean out door, and pop will be on the right.
back wall will have egg door, 12x24 open-able window and vents along the top
getting ready for the sides which will each have a 12x12" open-able window and vents along the top
sides all on
rafters ready to fasten
I'm terribly sunburnt, that's it for today!