The current bath in my one bath house has been remodeled. But when I moved in the only thing that was keeping me from falling through the floor was the linoleum.
First guy I hired to rehab and remodel went through the DTs while he was working. But between bouts of him disappearing and real work he did a great job the bathroom had to be ripped out down to the floor joists.
Thank goodness I had an outhouse.
Though I did step over a rattle snake on the way one evening.....
deb
First guy I hired to rehab and remodel went through the DTs while he was working. But between bouts of him disappearing and real work he did a great job the bathroom had to be ripped out down to the floor joists.
Thank goodness I had an outhouse.
Though I did step over a rattle snake on the way one evening.....

deb
and then 
Good thing there were so many children in my mom's family so outhouse was a two seater. 


90o F and 30 mph sustained winds for hours. That is NOT normal weather for us up northers for sure. The first coat of paint and some serious caulking done while DH got most of the insulation in the walls and and a couple sheets of stranboard up when we discovered we were short on insulation and other stuff so we surrendered to the heat, jumped into the air conditioned automobile and headed to town. We were bucking a serious headwind in the potato flats and fortunately we still had power in the house when we came home. Not so much for a lot of other folks. The winds apparently took down a lot of trees etc. Storms are potentially to be a bit wild tomorrow but we're ready for that so no worries there we and should still be able to get a lot of work done inside.
