Thanks Stumpy. fiddlebanshee, I think you're right. I have a clear plan in my head now about an attached run on 3 sides but I'm still not 100% on how to create a worry free zone on the bottom edges. I have read putting hardware cloth under the entire run and bringing it out a couple of feet and also digging vertical trenches to bury wire. I'm interested in the best long term solution, not the easiest one - problem is I can't tell which is which!. If I get this run on super lock-down, how do I incorporate a people door that does not compromise the rest of it? Does anyone have a close-up pick of a run people door?
THANKS FOR ALL YOUR HELP!!