- Thread starter
- #31
Understandable. I tend to over-plan and think ahead a lot myself, too, also because of job habits (also design, though in a different field), so I can relate. But in this case I'm also looking at the context and just need the overhang to not break under whatever snow will be on it I'm hoping the 6 inches of OSB board and metal roofing, supported by the 5" corrugated corner braces, would be enough.I'm trained to look for all possible failures....
....20 years designing pharmaceutical manufacturing equipment.