- Thread starter
- #31
Understandable. I tend to over-plan and think ahead a lot myself, too, also because of job habits (also design, though in a different field), so I can relate. But in this case I'm also looking at the context and just need the overhang to not break under whatever snow will be on itI'm trained to look for all possible failures....
....20 years designing pharmaceutical manufacturing equipment.
I'm hoping the 6 inches of OSB board and metal roofing, supported by the 5" corrugated corner braces, would be enough.
I'm trained to look for all possible failures....