Thanks for sharing this video and supply list. I feel I could do this now I need to figure out how to save it for later. My Dh is doing okay we've Been waiting on insurance to clear treatment planned.I got a letter saying it was cleared but not the resection our other surgeon suggested that the right front lobe be removed but current doctor said he isn't a candidate. So plans are chemo & radiation for 7 wks. He been having more headaches, fatigue, anxiety attacks I pray that things go smoothly. The current doctor told us to prepare for the worst and get our things in orderHello. all.. i finally caught up.. I've gotten lots of inspiration here from HeChicken Danz and Trish and just wanted to post a video.from you tube.. for any one.. like me who are looking for a visually orientation on how 2... 4 Hoop Coops.. - thanks.. for all your help and input... will post photo's.. when done.. Here's my video guide.. great video at you tube.. from Kentucky state university poultry department.
video on you tube.. 7 parts long.. ( 8 video's ) on the hoop coop construction.
however i've taken notes.. and will mark times of useful tips
- pig ring's.. we will need some to stabilize joint of cattle pannels
[COLOR=1155CC]Video 1 begins with parts & tool list.
1) furring strips.. screwed into 2x4 to make resting place for cattle pannel. on inside.
2) 2( 101" 2x4) he used 8' for end pieces because he's tall..
3) use scrap pieces for bracing..
4) welded wire.. for end piece [COLOR=1155CC]video 2[/COLOR]
5) place cattle pannel rib side up onto furring strip... says its easier on the tarp..
6) Fence staple every other iron bar. to 2x4 laying on furring strip.
time 3:50
7) show staple verticle placement of staple on last iron rod at juction of cattle pannel's
8) 4:12 he inserts #2 cattle pannel slick..
9) pig rings.. where the 2 pannels abut..
[COLOR=1155CC]video 3[/COLOR]
10) 2- 2x4's measure where door will be.. mark & screw 1 ( allow's to adkust top of frame)
marking top of 2x4 to where it meets hoop. sawzaw off
@5:21 moving hinge.. on top of door.. 2 re set.. hinge if too tall for opening.
6:50 how to make gate latch.. w add on 2x4 to make latch..
*8:22 safety tip.. string from inside.. for his latch .. incase it lockes you inside ( grin )
[COLOR=1155CC]Video 4[/COLOR]
Rear bracing.. t-bracing 3" up to match wire.. for protection.. >> due to
4:30 cornor braces.. knee bracing..
** if building on slope.. start at bottom.. and work way up
[COLOR=1155CC]Video 5 part 5 a - adding welding wire step 1[/COLOR]
Pig ring & welding wire.
wire will match up w/ 2x4 cross brace from rear X-brace string from back to front
2:30 min @ front end of welding wire.. cut.. and bend piece around Cattle panel to prevent tearing tarp.
4:30 attch bottom welding wire to hoop pen - he uses screw's and fender washers.. to
5:50 front end wire attchment Vertical welding wire..
[COLOR=1155CC]video 6 (part 5 b) Constructing a hoop pen - Part 5B: Adding the welded wire[/COLOR]
patching cornor with cut off pieces and hog rings
- to complete front protection - tight cornor and - to make smooth for tarp..
4:20 -rear protrection 8:20 bending corner
[COLOR=1155CC]Video 7[/COLOR] Part 6 adding the Tarp-
Tarp. the tighter the better
tightening up with rope at the ends..
additions for layers.. waterer Ideas
[COLOR=1155CC]Video 8 (part 7)[/COLOR]
Adding the toe rope[/COLOR]