So, for those of you who KNOW what you are doing...
I am making an 8x8 slanted roof coop. The front will be 8 ft and slope to 6 ft in the back with a 12 inch over hang on the front and back. I already framed up the front wall (8ft high) but got to thinking....should I have used screws or nails for this framing? I REALLY hate 3 inch screws because they ALWAYS strip half way thru. I practically have to drill a pilot hole for every screw...this would take FOREVER!!!
I was planning on building the 4 sides with nails, THEN screwing the 4 panels together. Thoughts?

I am making an 8x8 slanted roof coop. The front will be 8 ft and slope to 6 ft in the back with a 12 inch over hang on the front and back. I already framed up the front wall (8ft high) but got to thinking....should I have used screws or nails for this framing? I REALLY hate 3 inch screws because they ALWAYS strip half way thru. I practically have to drill a pilot hole for every screw...this would take FOREVER!!!