DIGGING A TRENCH SUCKS!!! That's what we initially did for our run, and it'll cost a fortune in concrete!!! Here's what we ended up doing instead of using concrete or burying wire!!
We attached a foot wide strip of welded wire to the perimeter of the run along the ground. I didn't want to cut individual wires to attach the strip of wire to my run, so I used the loose ends from the wire to attach it. You can see it in the second pic how there are loose ends that I slid under the run fence and twisted. Hope this helps!!!
Just make sure to tack it down with some tent stakes or 6 in bent wire/coat hanger to hold it down!!!


We attached a foot wide strip of welded wire to the perimeter of the run along the ground. I didn't want to cut individual wires to attach the strip of wire to my run, so I used the loose ends from the wire to attach it. You can see it in the second pic how there are loose ends that I slid under the run fence and twisted. Hope this helps!!!
Just make sure to tack it down with some tent stakes or 6 in bent wire/coat hanger to hold it down!!!
Last edited: