Update on the turkey chalet
View attachment 1393828 got the roof frame replaced
We used a 2x8x10 board across the front there my husband wanted to add a little head room inside and an overhang on the sides to protect the building from rain damage.... one of the reasons the original building failed is they brought the roof just to the edges and the rUn off went down the sides rotting the boards.
View attachment 1393829 here is a view of the back you can see we installed 4x4s to support the roof over the back storage area we are adding as well as the 2 foot overhang on the back side to keep my barrels out of the weather. The storage area will be enclosed and the plan is to put double doors that swing out. With any luck we will get the roof on this eve and be ready for painting the floor over the week end.