Due to the location of my run, I will be unable to skirt my hardware cloth outward. I will need to trench it down along the perimeter of our run. Then I plan on backfilling along the interior of the run with cement blocks, rip rap, and whatever else I stumble upon.
I was able to get a 3 foot rool of hardware cloth, and I was hoping that I could bury 1 foot, and run 2 foot up the sides, overlapping my 2x4 welded wire. Will 1 foot deep be enough? And, if by chance a predator does get under the cloth, how far into the run will they tunnel?
I was able to get a 3 foot rool of hardware cloth, and I was hoping that I could bury 1 foot, and run 2 foot up the sides, overlapping my 2x4 welded wire. Will 1 foot deep be enough? And, if by chance a predator does get under the cloth, how far into the run will they tunnel?