Asphalt shingles. We won't be quite that high,,,about 12' at the highest. Probably won't need all the sections, actually. Have to pick it up from whoever BIL loaned it to; not sure how much it will be. Shouldn't need all 3, come to think about it. I'm not overly enthused about being on top of 2 sections!
Yeah it gets wobbly, wire it to the building will help.
) Now only the grow out coop is hand operated, and I got my goat plaything half built. Everything but the screws is scrounged materials
I need to go back to work to rest
