- Thread starter
- #11
rjwhit4881
Chirping
A couple update pics. Work and weather have slowed my progress. Hope to get them in mid week. The grey is chinking mortar I'll need to go back and clean off the extra. The PVC feed and water containers are removable. I added logs offset in the soffits about an inch for ventilation. The gable peaks on the ends have gaps as well.
A few things left to do. I have leftover vinyl planks I planned on using over the floor. Still have some work to do in the nesting box areas. Going to make removable nesting boxes later. For now I'm just going to block them off. Add some treads to the ramp. The big doors on the back will need an upgrade. Plywood is starting to warp already.
I wanted to add these to my original post but couldn't figure out how if even can.
A few things left to do. I have leftover vinyl planks I planned on using over the floor. Still have some work to do in the nesting box areas. Going to make removable nesting boxes later. For now I'm just going to block them off. Add some treads to the ramp. The big doors on the back will need an upgrade. Plywood is starting to warp already.
I wanted to add these to my original post but couldn't figure out how if even can.