I want to build a coop. I think I can handle most of it but getting started is tripping me up.
Here's the deal:
I want the coop off the ground so I had planned on putting Four 4"x4" posts in the ground then mounting the floor on top of that. The posts would be 12-18" high off the ground and then the coop floor would set on those four posts. My problem is how do I go about leveling and making those four support posts square and level?
My step father is helping me but here's another problem, he kind of just wings it. His coop is crooked. I asked him how we were going do this and he said "use a t square." I wasn't too sure about that. We are talking about 3d here. Height, perfect square, etc.
You have uneven ground (it's sloped and I want to use that slope (10 degrees or so) to help with drainage so I'm not leveling the ground. You have four posts that all have to be the same height and to be level.
My initial plan is this
Pre build the floor. Six 2x4s in a 6'x6' square, no flooring added yet.
Mark off the 6'x6' area with stakes to mark off where the four posts will be. Dig the holes, put the posts in there then set the floor which is level and square on top of the posts to make sure everything is level and square. Since the floor is square and level it seems like it would be easier to use that as a guide. Does that make sense?
I don't know, so help me out please.
Thanks
Here's the deal:
I want the coop off the ground so I had planned on putting Four 4"x4" posts in the ground then mounting the floor on top of that. The posts would be 12-18" high off the ground and then the coop floor would set on those four posts. My problem is how do I go about leveling and making those four support posts square and level?
My step father is helping me but here's another problem, he kind of just wings it. His coop is crooked. I asked him how we were going do this and he said "use a t square." I wasn't too sure about that. We are talking about 3d here. Height, perfect square, etc.
You have uneven ground (it's sloped and I want to use that slope (10 degrees or so) to help with drainage so I'm not leveling the ground. You have four posts that all have to be the same height and to be level.
My initial plan is this
Pre build the floor. Six 2x4s in a 6'x6' square, no flooring added yet.
Mark off the 6'x6' area with stakes to mark off where the four posts will be. Dig the holes, put the posts in there then set the floor which is level and square on top of the posts to make sure everything is level and square. Since the floor is square and level it seems like it would be easier to use that as a guide. Does that make sense?
I don't know, so help me out please.
Thanks